7,157



 

 

 



DESPATCH ALERTS
Be notified of latest updates by email.
POSTS
 
Despatches

Post: Monday 22, November 2010

Fast descent

After an early start, we retraced our steps down from Imja Tse base camp. Had lunch at Chhukung, and were back down at 4410m in Dingboche for the night. Hot shower.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 
 
         
Copyright 2009 Evans on Everest 2010. All rights reserved. Conditions